Articles for March, 2008
04 March, 2008
TransGrid is proposing to construct a new 132,000 volt transmission line between substations at Parkes and Manildra, which is necessary in order to meet the energy needs of the Central Slopes and Plains regions.
10 March, 2008
Powerlink and TransGrid today released a report on their studies into the optimal economic timing and configuration of a future upgrade of the Queensland/New South Wales Interconnector.