North West Slopes Area Supply | North West Slopes Area Supply | TransGrid is applying the Regulatory Investment Test for Transmission (RIT-T) to options for maintaining reliable supply to the North West Slopes area of northern NSW. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/North West Slopes Area Supply | 18/04/2021 2:00:00 PM |
Bathurst, Orange and Parkes Areas Supply | Bathurst, Orange and Parkes Areas Supply | TransGrid is applying the Regulatory Investment Test for Transmission (RIT-T) to options for maintaining reliable supply in the Bathurst, Orange and Parkes areas in Central West NSW. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Bathurst Orange and Parkes Area Supply | 15/03/2021 1:00:00 PM |
Powering Sydney's Future | Powering Sydney's Future | A new transmission cable will be installed from Potts Hill to Alexandria. The Powering Sydney’s Future project will ensure safe, reliable and affordable electricity supply for Sydney’s CBD and surrounding areas. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/powering-sydneys-future | 24/10/2020 1:00:00 PM |
EnergyConnect | EnergyConnect | EnergyConnect is a proposed new electricity interconnector between Robertstown in South Australia and Wagga Wagga in New South Wales, with a connection into Victoria. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/SANSWInterconnector | 23/10/2020 1:00:00 PM |
QLD-NSW Interconnector (QNI) Upgrade | QLD-NSW Interconnector (QNI) Upgrade | Upgrading the Queensland-NSW Interconnector (QNI) will boost interstate transmission capacity and increase power flow on existing transmission lines. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/ExpandingNSWQLDTransmissionTransferCapacity | 21/10/2020 1:00:00 PM |
HumeLink | HumeLink | The NSW Southern Shared Network RIT-T seeks to remove existing network constraints and transfer new generation in southern NSW to major demand centres. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Reinforcing the NSW Southern Shared Network | 18/10/2020 1:00:00 PM |
Victoria-NSW Interconnector (VNI) Upgrade | Victoria-NSW Interconnector (VNI) Upgrade | Upgrading the interconnector between Victoria and NSW will allow cheaper generation to be transferred between the two states. This will help lower the cost of wholesale electricity and put downward pressure on customer bills. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Victoria to NSW Interconnector | 17/10/2020 1:00:00 PM |
Central-West Orana REZ Transmission | Central-West Orana REZ Transmission | TransGrid is working with the NSW Government to plan new transmission infrastructure for the development of Australia’s first coordinated Renewable Energy Zone (REZ) in the state’s Central-West Orana region. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/CentralWest | 14/10/2020 1:00:00 PM |
Victoria-NSW Interconnector West (VNI West) | Victoria-NSW Interconnector West (VNI West) | The VNI West proposed expansion seeks to address identified transmission network limitations and manage future energy supply reliability. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Victoria to NSW Interconnector West | 1/10/2020 2:00:00 PM |
Wallgrove Grid Battery | Wallgrove Grid Battery | TransGrid is installing the first large-scale grid battery in NSW, at its Wallgrove substation in Western Sydney. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Wallgrove | 30/09/2020 2:00:00 PM |
Broken Hill Supply | Broken Hill Supply | Broken Hill is one step closer to becoming one of the world’s largest grid-connected all renewable mini-grids. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Broken Hill Supply | 7/12/2019 1:00:00 PM |
Stockdill Substation | Stockdill Substation | TransGrid's new 330/132kV Stockdill Substation will provide the ACT with a second supply point, and one that is independent of Canberra 330/132kV Substation. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Stockdill | 5/12/2019 1:00:00 PM |
Snowy 2.0 Connection Project | Snowy 2.0 Connection Project | Connecting an expanded Snowy Hydro scheme to the electricity grid. Snowy Hydro Limited is our client for this proposal. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Snowy 2.0 | 6/11/2019 1:00:00 PM |
Improving stability in south-western NSW | Improving stability in south-western NSW | TransGrid is applying the Regulatory Investment Test for Transmission (RIT-T) to options for improving stability in the south-western New South Wales power system. | | https://www.transgrid.com.au/what-we-do/projects/current-projects/Improving stability in south-western NSW | 27/07/2019 2:00:00 PM |