A new transmission connection and substation is proposed to connect Snowy 2.0 to the National Electricity Market (NEM).

Snowy 2.0 is a pumped hydro expansion of the existing Snowy Scheme planned by Snowy Hydro Limited with an anticipated capacity of 2000 megawatts.

Why is a connection necessary?

New generation assets need to be connected to the transmission network to be able to operate within the NEM. Snowy 2.0 requires this transmission and substation connection to connect their generation into the existing transmission network to therefore unlock the full capacity of the Snowy 2.0 project.

What is Transgrid proposing?

Transgrid is proposing to construct and operate a dual 330kV double circuit overhead transmission connection and substation to meet the grid connection requirements of Snowy 2.0.

The two lines would be side-by-side, spanning from the Snowy 2.0 generator site through Kosciuszko National Park to the new substation located in Bago State Forest, adjacent to Transgrid’s existing Transmission Line 64.

The length of the connection is approximately 9 kilometres.

Latest update

An Environmental Impact Statement was lodged with the Department of Planning and Environment (DPE)  in February 2021 and placed on public exhibition for six weeks.

Transgrid lodged a Response to Submissions Report with DPE on 10 March 2022, responding to issues raised during public exhibition period.

State Government approval for the project was received in September 2022.

The project is subject to Commonwealth Government approval under the Environment Protection and Biodiversity Conservation Act 1999, with a decision expected in the final quarter of 2022.

Pending Commonwealth approval, construction is expected to commence in early 2023 and be complete by mid-2025.

View a copy of the EIS. To see the relevant documents, visit the DPE website.

For access to information on this project, including access to the Snowy 2.0 Transmission Connection Project environmental documentation, click on the button below to visit Lumea's website.

Resources

Guides and Fact Sheets

Document

PDF 1.47 MB

Document

PDF 11.82 MB

Document

PDF 1.25 MB

Document

PDF 1.24 MB

Contact us

​Community Information Line: 1800 222 537
Email: community@transgrid.com.au