We're going paperless
From July 2026, HumeLink West will transition to digital communications. This change supports our ongoing commitment to environmental sustainability by reducing paper and fuel use and helps minimise our overall environmental footprint.
To receive regular project updates, newsletters and important information via email and/or SMS, please complete the registration form. If you would prefer to continue receiving paper communications, you can indicate this in the form.
About HumeLink West
HumeLink will deliver a more reliable and more sustainable grid, create more than 1600 jobs and generate major benefits for local communities along the route.
Transgrid has contracted UGL Engineering Pty Ltd and CPB Contractors Pty Ltd (UGL-CPB JV) to deliver the western portion of the HumeLink project.
HumeLink West involves the expansion of the existing Wagga Wagga 330 kV substation, the design and construction of a new substation at Gugaa and connection works to the future Maragle 500 kV substation. The project also includes a new 500 kV double circuit transmission line to connect the substations at the Wondalga interface point with HumeLink East.

Figure 1: Division of HumeLink East and HumeLink West sections
HumeLink West project update
Main construction continues to progress along the HumeLink West alignment, with teams moving from tower assembly and erection into active line stringing. Main construction involves building transmission towers and stringing transmission lines across the 140km HumeLink West alignment, building the Maragle and Gugaa 500 kV substations, and upgrading the Wagga Wagga 330 kV substation.
Line stringing operations are currently underway. In June 2026, the first conductors were successfully strung along a 2.3km km section of the alignment that interfaces with Wagga Wagga Substation at Gregadoo. Conductor installation is carried out using aerial stringing methods, with drones and helicopters used to safely install the pilot cable and conductors. To learn more about the process, please see our stringing fact sheet. Stringing activities will continue from Gregadoo towards Ellerslie and Green Hills, before progressing through Bago State Forest and on to Maragle in the Snowy Valleys.
The first HumeLink West transmission tower was erected in October 2025 at Gregadoo, east of Wagga Wagga. Since then, more than 20% of the transmission towers needed for HumeLink West have been erected. Tower assembly and erection crews are currently building around five to ten towers each week, with construction expected to continue to ramp up as more workers join the project. Stringing of the first conductors between towers will start near Wagga Wagga in May 2026.To learn more about tower construction and conductor stringing, please see our tower fact sheet.
As construction activity increases, there will be more project vehicles traveling along local roads and near construction sites. Stay informed about current traffic conditions – visit Live Traffic NSW for real-time updates on road closures, delays and conditions. To learn more about vehicle movement across the project alignment, view the HumeLink West Vehicle Movement Plan.
View our latest community newsletter to learn about our recent events and initiatives and hear more about what to expect over the coming months.
Quarterly community newsletters
Document
Document
Document
Document
Document
Document
Monthly construction updates
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
What's happening in the community
We continue to host community information sessions and participate in local events across the HumeLink West project area to share updates and connect with the community. If you're interested in learning more about the project or speaking with the team, we encourage you to come along to our upcoming events listed below. You can also visit us at the Snowy Valleys Resilience Hub, 37 Pioneer Street Batlow, open on Monday to Friday, from 9am to 5pm.
To receive regular updates about events in your community, register to the HumeLink email distribution list.
Resources from past community events
Document
Document
Document
Work notifications
Main construction continues to progress and involves building transmission towers and stringing transmission lines across the 140km HumeLink West alignment, building the Maragle and Gugaa 500 kV substations, and upgrading the Wagga Wagga 330 kV substation.
Current and ongoing construction activities include:
- Line stringing operations - use of drones, helicopters and specialised tensioning equipment to guide and install conductors between towers.
- Excavating with piling rigs and excavators for the tower foundations
- Concrete works for the tower bases, including reinforcement and concrete pours
- Assembling and lifting the towers using cranes
- Access and site establishment
- Vegetation clearing, excavation and earthwork
- Ongoing construction and maintenance of access tracks and points, along with operation of temporary site compounds and accommodation facilities.
- Installing amenities, fencing, signage, barriers and other controls
- Equipment and other deliveries to work sites with heavy and light vehicles
- Survey, investigation and monitoring, including drone and aerial photography
The work is undertaken by HumeLink West Joint Venture (UGL Engineering and CPB contractors), in line with the relevant guidelines and approvals.
Work will take place during standard construction hours of 7am to 6pm Monday to Friday and 8am-1pm on Saturdays. If out of hours work is required, we will contact all impacted landholders and near neighbours seven days before work starts.
Stay informed about current traffic conditions in the HumeLink project areas. Visit Live Traffic NSW for real-time updates on road closures, delays and conditions. To learn more about vehicle movement across the project alignment, view the HumeLink West Vehicle Movement Plan.
Current notifications
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Past notifications
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Fact sheets
Explore the HumeLink West fact sheets for information on HumeLink West construction works. To view Transgrid's fact sheets that were issued during the planning stages, click here.
HumeLink West fact sheets
Document
Document
Document
Document
Document
Document
Document
Document
Procurement
We're making it easy for local business to participate and find work with the project through the Industry Capability Network (ICN).
Visit the HumeLink West ICN page to register your interest and search for available packages.
We have also partnered with Supply Nation to connect Aboriginal businesses with procurement opportunities on the project. Register for Supply Nation here.
Local Business Register
The project requires a variety of products and services, and all packages may not be listed on ICN. If you’re interested in registering your business for potential opportunities as the project progresses, please submit an expression of interest to the Humelink local business register.
Please note: registering your interest does not guarantee employment.
Planning, approvals and policies
To see the status of the planning approvals pathway visit the NSW Government Major Projects Planning Portal.
Planning, approvals and policies
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Strategies, Plans and Programs
Strategies
Document
Document
Document
Social Impact Management Plan Monitoring
Document
Document
Document
Traffic and Transport Reports
Document
Document
Management plans
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Document
Biodiversity Management Plan
Management plan - current
Document
Document
Document
Document
Document
Management plan - superseded
Document
Document
Document
Document
HumeLink West Independent Environmental Audits and Complaints Register
Independent environmental audits
Document
Complaints register
Document
Contact us
Enquiries and feedback
Your feedback is valuable to us and helps improve our systems, processes and interactions with the community. We are committed to effectively engaging with you. If you would like to make an enquiry or provide feedback to the HumeLink West project team, please fill out the form below or call the HumeLink hotline on 1800 317 367 (free call, business hours).
You can also provide feedback by emailing humelink@transgrid.com.au
Subscribe to our newsletter here
Please note:
- All responses will remain confidential.
- If you are a business interested in working on the HumeLink Project, please complete our online HumeLink Local Business Register form. Additionally, we encourage businesses to register with the ICN Gateway (free registration) to access the details of work packages – all our packages are advertised on the ICN Gateway. Available work packages can be found at Humelink West (icn.org.au) and Humelink East (icn.org.au).
- If you would like to express your interest in working with HumeLink West, please complete the following form: Humelink West Employment EOI.
- For media enquiries, please direct these to Transgrid’s media team. Contact details available at: https://www.transgrid.com.au/media-publications
- If you are a landowner please contact your Land Access Coordinator as primary point of contact.